11/10/19 Olive AMPS 228; +5=216; PMPS 185; +6=102

Olive & Paula

Member Since 2015
Yesterday. Caber Yr 2 Day 36

Dosecrease on board.

Agenda today is to finish painting. Decided I needed to do the dining room walls so that means I need to move refrigerator and cat food shelving out of way.

Cabinets to go in tomorrow !!!!!!

Gotta get a painting. Everyone have a good day and I will catch up tonight, although I really got to get to the bills, but who wants to do that.
 
images
 
LOL! Paula, it sounds like scope creep to me...now you're painting the DR?:p

I hope Olive works the dosecrease to the max!

:bighug::bighug:
 
Yeah gotta paint the DR. Kitchen and DR is all one room basically. The peninsula is all that divides them. The 70's open concept.

Once all the door trim is done which will take me months to do, then the living room needs to be painted because the paneling that came down in kitchen/dining involved the entry way to the living room.

So I lower the heat in kitchen and living room since I'm working, have t-shirt on, husband turns heat up to 70 in living room and has the wood stove in basement going. Is he trying to cook me out?????? After dinner, I need to move everything out again that husband moved in for the weekend so it's easier for him.

You know he will have everything in the cabinets before I get them wiped down and lined. Much to do yet.
 
Back
Top